Wells Mews, W1

Wells Mews.png

Client

Fora is taking forward thinkers on an exciting journey to reimagine the working day. Comprising flexible, consciously designed spaces, premium amenities, a curated programme of events, and a 360-degree wellness offering, the Fora experience is engineered to maximise productivity, wellbeing and overall workplace satisfaction. Since launching in Clerkenwell in 2015, the Fora network has grown to 11 locations across London – including Soho, Spitalfields and Borough – and two additional locations in Reading and Cambridge. Personalised service, dynamic spaces and enhanced technology have inspired organisations such as Sony, Dropbox, and the British Fashion Council to make Fora their workspace home. Whether employed by large enterprises, small businesses, or start-ups, Fora clients – called Residents – leverage the unique Fora experience to forge connections, feed curiosity, and ultimately feel Wonderful at Work.

Scope

Trigon, collaborating with the fit-out design team, was appointed to deliver fire engineering consultancy and a fire safety strategy report to be integrated within the Building Regulation submission.

Considerations for The Wells Mews development included the variety of uses over different floors:

  • Office Space - ground floor and upper floors

  • Basement Space - dedicated wellness facilities, featuring a state-of-the-art gym, along with a wellbeing studio offering timetabled classes.

Our responsibilities included:

  • Complying with standard fire safety guidance and interpreting the parameters of the base build design.

  • Developing a robust fire safety strategy that addresses the proposed fit-out design and matches the requirements for Building Regulation submission.

  • Providing fire engineering support and guidance on the possible link to an adjacent office building as part of a future development opportunity.

Results

Trigon effectively delivered a fire safety strategy that met our clients’ needs for the building’s development.

Communication of fire safety principles to all stakeholders from the design team, Statutory Authorities, contractor and the management agent was at the fore of this premium end flexi office project.

Previous
Previous

Gascoigne East, Phase 3A

Next
Next

Finsbury Circus Pavilion and Park Office