Doncaster Sheffield Airport
Client
Scope
Doncaster Sheffield Airport originally opened in 2005 and ceased passenger operations in 2022. Trigon was appointed to provide fire engineering support for the proposal to reopen the main terminal to facilitate the return of passenger services and re-engineer the terminal to support 200% increase in passenger capacity. Trigon provided early-stage fire engineering advice to inform the development of the proposals and reviewed the fire safety implications of modifications to the existing terminal building. Doncaster Council adopted MaxQ's live co-design framework, requiring the professional team to give live advice in workshops led by MaxQ and held within the terminal building itself.
Our responsibilities included:
Reviewing the existing fire safety strategy for the terminal building and identifying considerations relevant to its proposed reopening.
Providing fire engineering advice on the proposed internal reconfigurations, including the security search area, departures lounge, airline lounges, and immigration/customs facilities.
Participating in site visits and collaborative design workshops to assess developing proposals, highlight the fire safety considerations.
Results
Trigon worked closely with the wider design team during a series of innovative design workshops held within the terminal building. Using virtual reality and gaming technology, design options were assessed and refined in real time, allowing the fire safety implications to be considered as the proposals evolved.
The fire engineering input demonstrated the feasibility of the proposed arrangements, helping to inform the ongoing design development and supporting plans for the future reopening of this important regional airport.